Москва
Резюме № 48219541
Обновлено 29 сентября 2020
Превью фото соискателя

Project Manager, Construction, Commissioning, Engineering, Maintenance Manager

Был больше месяца назад
По договорённости
39 лет (родился 04 мая 1986)
Москваготов к переезду
Условия занятости
Вахта
В офисе/На объекте
Гражданство
Россия
Контакты
Телефон

Почта
Будут доступны после открытия
Фото, имя и контакты доступны только авторизованным пользователям

Опыт работы 18 лет

    • Март 2019 – работает сейчас
    • 6 лет и 10 месяцев

    PMC Project Manager

    Bilfinger Tebodin CIS B.V.
    Timber Industry (Production), Metalware, Metal Structures (Manufacturing), Oil Refining, Petrochemistry (Production), Oil Extraction, Gas Extraction

    Обязанности и достижения:

    PROJECT: JSC MONDI "Construction and modernization of the integrated pulp-and-paper mill - Construction of a new evaporation station, vacuum compression unit, tall oil production unit ", Moscow, Republic of Komi, Syktyvkar, Russia. Hazardous Industrial Facility – CAPEX ˃60M €, directly subordinating -15 staff (Project managers). JOB DUTIES: • Acquisition Ensuring and control to liaising with existing customers and preparing tenders. This is going on in cooperation and consultation with one or more regional MT-member (s) and within the strategy of Tebodin, to be able to quickly identify opportunities and to acquire new business. • Initiating Accountable for the implementation of inventory and preparatory work, in consultation with the Project Sponsor and following the customer contract, to gain insight into the size and feasibility of the project, the stakeholders involved, initial risks, and the composition of the project team required to run the project. • Planning Accountable for the realization of the Project Plan, including scope, planning, budget, QOHSE, project team, stakeholders, communication between stakeholders, risks, procurement, and construction, in consultation with the Project Sponsor and following the offer made to the customer, to give the stakeholders of the project insight into the project approach, with the aim of unequivocal project implementation. Deployment Lean Construction Management, Capex Management. • Implementation Managing the implementation of the project, following the project plan, concerning the design, procurement and implementation, taking into account the contractual arrangements, planning, budget, and quality requirements, such that the project objectives are achieved. There is constant attention in managing and effectively communicating with stakeholders. Responsible for collecting, synchronizing, and analyzing information to prepare progress reports and presentations for PMC BU Director and Steering Committee of the customer weekly. • Project control Accountable for comparing the actual progress against the planned progress, identifying and analyzing deviations (scope changes), following the project plan, to inform stakeholders about the project status, possibly initiating corrective measures, so that all activities can be performed within the budget, and that an optimal project result will be achieved. • Closing Accountable for both internal and external project completion of the project and transferring the project result as agreed with the customer, to meet all contractual obligations and any adjustments of existing processes and procedures within the framework of continuous improvement. Ensuring to obtain the Statement of conformity following the Town-Planning Code of the Russian Federation. Project executive in charge of adoption of Lean construction, engineering harmony and smart modern technology according to industry 4.0: - Using Building Information Modeling (BIM) - higher quality, lower costs and better control; - Virtual Reality for plant design - adapting a feature to view your 3D models in Virtual Reality. Using Google Cardboard / Gear VR (or equivalent VR headset) to experience a pre-rendered 360° VR view of a fixed position in one of our 3D models; - Process design using PDMS and other advanced software; - Drones - construction process monitoring, drones in the service of BIM technology; • OHSE Accountable for the implementation of security checks and reviews, following the OHSE guidelines, laws and regulations, and specific customer requirements, guaranteeing the safety of all parties involved during and after the project. ACHIEVEMENTS: Successfully introduced Lean construction technology and value engineering sessions. Managed successfully keep the project under budget and within deadlines while faced with difficulties in limited human resources, difficult state examination and changes proposed by the Client.
    • Сентябрь 2017 – март 2019
    • 1 год и 7 месяцев

    Service Engineering Manager

    Обязанности и достижения:

    PROJECT: Customer 1 - North Caspian Operating Company N.V: Integrated oil and gas chemical complex «Karabatan»- Offshore/Onshore objects. Project investments – approx. $ 3 billion, human resources on construction and commissioning: approx. 13 000. Directly subordinating - 45 staff. Customer 2 - Karachaganak Petroleum Operating B.V.: exploration, production of oil, natural gas and gas condensate – onshore operations. Directly subordinating - 15 staff. JOB DUTIES: • Setting up an operational business plan in collaboration with PM's / KAM's, proposal and engineering office for service activities including a forecast for service revenue, profit and manpower resource planning and utilization. Managing service works execution to maximize business performance whilst ensuring continued customer satisfaction. • Ensuring the success of the JV performance and business growth by providing support and collaboration with other operations and functions for the overall benefit of the company. This especially includes supporting and working closely with the PM and engineering office for each contract; • Directing, planning and prioritizing the use of the Service Team resources to achieve the optimum utilization and profitability. Constantly assessing the Service Team performance to identify and implement improvement actions based on customer feedback; • Leading, coaching and motivating the Service Team members to achieve excellence in their roles and profession ensuring identification and fast-tracking of high potential employees. Ensuring measurable objectives are established with all operations staff with regular monitoring of performance; • Planning and engaging the necessary resources to ensure all Service Team employees have got necessary professional training and knowledge, access to tools and systems enabling them to deliver their work and meet customer expectations; • In collaboration with HR, planning and executing the company competence localization program acquiring, training and retaining local automation engineers; • Establishing and maintaining good working relationships with clients. Sharing intelligence with other relevant parts of the business; • Evaluating and reporting the Service Team performance measurement and forecast in line with management requirements; • Ensuring adherence to all relevant policies, procedures, and regulations. In particular, all safety, quality and HSE requirements; • Samples of implementation solutions: Foxboro I/A, Evo DCS systems, HMI, Triconex ESD, F&G, SIS, ICSS, SCADA, RTU’s, Wonderware, FATs & SATs, support of the third-party vendors (Rockwell Automation, HIMA, Siemens etc.). ACHIEVEMENTS: I organized the training of my engineers with our colleagues in the UAE and the UK, who gained invaluable international experience in managing automated systems in complex and hazardous production facilities, which helped to avoid the effects of Petya's virus attacks without losing the customer’s production assets and fulfilling contractual obligations. The backlog of the project plan was reduced. Overall work of the newly assembled international engineering team became more efficient, transparent and satisfied.
    • Октябрь 2016 – сентябрь 2017
    • 1 год

    Installation Commissioning Manager

    Enter Engineering Pte. Ltd. Singapore
    Industrial Construction, Energy Construction, Construction of Oil and Gas Industry Facilities, Oil Extraction, Gas Extraction

    Обязанности и достижения:

    PROJECT: EPCC contract of the Central Processing Facility Complex and development facilities of the Kandym group of fields, Gas Processing Plant and Infrastructure, Republic of Uzbekistan. Customer: Lukoil Uzbekistan Operating Company LLC; Lead Partner: Hyundai Engineering and Construction Co., Ltd, Seoul, South Korea; Project investments – ˃ $ 3 billion, directly subordinating – 100 staff. JOB DUTIES: • Managing and organizing the day to day construction and commissioning activities associated with the project; • Ensuring and control the time, cost and quality of the project, terms, schedules, budget, personnel, purchases; • Managing and coordinate of contracted and subcontracted companies, vendors; • Developing commissioning procedures; • Preparation of programs for the complex delivery of the object and it's systems for operations to the customer; • Planning and coordinate all aspects of the construction and commissioning process, including hiring contractors and working with engineers, architects, and vendors; • Managing over the conduct of commissioning works and supply of equipment; • Determination of planning the various phases of the project based on deadlines; • Developing technical documentation, procedures, schedules; • Managing of installations (hook-up) activities; • Development of actions aimed at improving the organization of services and setting up equipment, to reduce the complexity and cost of the works, improvement of their quality; • Initiating of direct on-site safety audits related to HSE in construction and commissioning activities; ACHIEVEMENTS: After my appointment, the newly assembled international project management team became more efficient and transparent, which allowed me to reduce the backlog of the project plan and increase the number of equipment delivered to the site (for example, the daily supply of the pipeline increased from 14 to 27 tons per day), which allowed putting into operation a camp for workers following the contract.
    • Май 2016 – октябрь 2016
    • 6 месяцев

    Construction E&I Supervisor

    North Caspian Operating Company N.V
    Oil Transportation, Storage, Oil Refining, Petrochemistry (Production), Gas Processing, Gas Transportation, Storage

    Обязанности и достижения:

    PROJECT: Bolashak onshore processing facility. Kashagan field development experimental program. Petrochemical large complex construction. Project investments – approx. $ 3 billion, directly subordinating – 30 staff. JOB DUTIES: • Lead and coordinate electrical and instrumentation maintenance activities of the processing plant, auxiliary infrastructure (water supply, camp, etc.) and, electrical activities to and around the site during the Operational Readiness, post-commissioning, and production ramp-up stages; • Work directly with Supply Chain team to manage materials inventories to minimize downtime and maximize throughput. Checked the availability and status of required materials daily; • Maximizing plant runtime and production through leadership and direction of staff and communication and coordination with the operations, training staff groups inside the Process Department and with internal groups such as E&I and HSE; • Ensuring that communications are timely and efficient concerning staff, senior management and other groups as appropriate. This communication will include and senior site meetings, reports as determined by senior management, programmed coordination meetings with operations and maintenance and other meetings as required; • Supervising and monitoring electrical and instrumentation employees to ensure that they work efficiently and effectively provide needed services while staying within budgetary limits; • Worked to establish and implement departmental policies, objectives, and procedures as part of a team; • Providing leadership for subordinate staff, including activities such as preparing work schedules, preparing job descriptions and assigning specific duties and tasks; • Selection, training and developing of candidates for subordinate roles with an eye towards those with an exceptional talent for promotional and succession planning opportunity; • Leading and mentoring (coaching) the key departmental subordinates to ensure that the operational deliverables are consistently realized within their areas of accountability; • Ensuring that the highest safety, health, and environmental standards are met or exceeded and promote a culture of awareness and commitment to safe working practices; ACHIEVEMENTS: After the change of the general contractor represented by ENI (Italy), I managed to assemble an effective team, restore the working documentation following the construction project plan and following the legislation of the Republic of Kazakhstan. It was possible to achieve full interaction with state supervisory authorities, the holders of the contract, which allowed minimizing shifts in the project implementation period based on safety procedures.
    • Апрель 2015 – апрель 2016
    • 1 год и 1 месяц

    Field Service Supervisor

    SIEMENS
    Equipment and Machines for Mining, Energy, Oil and Gas, and Chemical Industries (Assembly, Maintenance, Repair), Equipment and Machines for Mining, Energy, Oil and Gas, and Chemical Industries (Manufacturing), Gas Transportation, Storage

    Обязанности и достижения:

    PROJECT: Until the middle of 2014 this segment of the business owned by Rolls-Royce Holdings Plc. The main gas pipeline Central Asia - China with seven compressor stations, which located remotely from each other in the Kazakhstan area. Project investments – approx. $ 7.5 billion, directly subordinating – 10 staff. JOB DUTIES: • Support the Middle East & Central Asia region by providing both field service and technical support to customers based in the region; • The role of the Field Service Supervisor is to provide technical supervising field service, as required. Installation and Commissioning of Compressor Station of Turkmenistan-China Gas pipeline. Installation of high-bypass turbofan engines RB211, Power Turbine RT62 and Centrifugal Compressor RFB-36 made by Rolls-Royce plc.; • Providing on-site technical direction on control systems, loop checks, system tests during start-up, maintenance on customer-owned industrial facilities; • Preparation of job-planning documents that define the control system scope of the outage utilizing problem-solving skills, engineering instructions, drawings, and process instructions for gas turbine commissioning and start-up; • Providing daily and weekly reports; • Effectively communicating with service managers and site leaders on job planning and execution and with resource directors regarding site arrivals, departures, and job progression; • Providing leadership and technical direction to skilled labour performing work on customer sites; • Maintaining strong safety rules for the executing work, which reflected in technical requirements; • Possessing the technical capacity to troubleshoot and provide routine maintenance checkout for a wide range of equipment; • Preparing timely and accurate technical reports for customer records and a reference for future outages; • Supervising of troubleshooting, maintenance concerns in the gas turbine technologies, trained and certified in the UK; ACHIEVEMENTS: Reduced number of meetings and trips by implementing an effective reporting system, shifting focus to actual workload and increasing transparency between remote sites. 81% of project managers noticed a significant increase of efficiency.
    • Ноябрь 2013 – ноябрь 2014
    • 1 год и 1 месяц

    Senior Shutdown Instrument work preparer

    Sakhalin Energy Investment Company
    Oil Transportation, Storage, Oil Extraction, Gas Processing, Gas Extraction, Gas Transportation, Storage

    Обязанности и достижения:

    PROJECT: Onshore processing facility, LNG plant, booster stations, including 4 offshore platforms: «LUN-A», «Piltun-A-B» and «Molikpaq» at Sakhalin-2 project, Russia, Sakhalin region, Okhotsk Sea JOB DUTIES: • Supervising of the work preparation for maintenance of instrumentation discipline for shutdown trains, compressors and pit stops turbines on the Onshore Processing Facility in the Okhotsk Sea; • Supervising of execution of works in during shutdown with reporting to shutdown manager. Preparation of work packs, permits to work, work orders, materials, isolation certificates, person-hours in SAP and ISSOW (Level-2, Isolation Authority) ERP systems for instrumentation team; • Ensuring and control with automation team of installation overrides, switch off an alarm, MOS (maintenance override switch), FORCE of the signals, ALARM OFF, SOC, suppression, shelving mode for alarm signals in the DCS Yokogawa system; • Work with Centum VP and Prosafe-RS systems, tuning HMI and DCS; • Preparation of special tools, drawings (P&ID, C&E, Loop Diagrams, Vessel Sketches etc.), safety plans, risk assessment, dynamic risk assessment (5 steps-5 min), control measures, planning and control performance of work in Primavera P6; • Participation in the inspection of explosion protection, condensate and MEG reservoirs/tanks corrosion inspection; • Participation as a functional member of Risk Assessments such as HAZOP (Hazard & Operability), SAFOP (Safety & Operability), HAZAN (Hazard Analysis) and HAZID (Hazard identification), root cause analysis, maintenance integrity execution; • Maintenance of instrument equipment: pressure and differential pressure, level, BDV and SDV valves, control valves, temperature, flow, pumps systems, compressor systems, F&G Minimax systems, Yokogawa F&G PROSAFE systems, ESD and PSD devices, coordination (SIL 1.2.3), purge panels for booster compressors and overhead compressors. Full cooperation with operations, mechanical, HVAC, electrical, HSE teams. Maintenance of the Honeywell Excel 5000 HVAC system, full interaction with the F&G system; • Work preparation for in a confined space, cold and hot works (1, 2 categories). ACHIEVEMENTS: The successful shutdown of onshore and offshore assets in extremely harsh conditions of the far north, done on schedule during 27 days, safely and without loss of man-hours. I was recognized by the site manager with a letter of recommendation in regards to the successful shutdown.
    • Апрель 2013 – ноябрь 2013
    • 8 месяцев

    Head of business development and sales

    Detrade Automatic LLP

    Обязанности и достижения:

    PROJECT: Supply/ sales/service of equipment for process automation for large international oil and gas companies in Kazakhstan (B2B); JOB DUTIES: • Achieving growth and hit monthly/yearly sales target; • Identifying emerging markets and market shifts while being fully aware of competition status; • Managing/training/hiring technical sales/service team; • Performance management of internal technical sales team; • Ensuring the client queries are addressed promptly; • Devising strategies to approach prospects; • Writing proposals whenever required; • Organizing the meetings with potential clients; • Attending events for networking purpose; • Heading the entire western and southern Kazakhstan regions for technical sales and business development teams. ACHIEVEMENTS: 50% increase in sales per year with prospective customers.
    • Сентябрь 2011 – март 2013
    • 1 год и 7 месяцев

    Duty instrumentation engineer

    Chevron
    Oil Refining, Petrochemistry (Production), Oil Extraction, Gas Processing, Gas Extraction, Gas Transportation, Storage

    Обязанности и достижения:

    PROJECT: Complex Technological Lines, Second Generation Plant, Future Growth Project - Wellhead Pressure Management Project, Sour Gas Injection (SGI) facilities. Project investments – ˃ $ 20 billion; JOB DUTIES: • Calibration and verification of temperature, pressure, differential pressure, flow and level gauges at the field with representatives of metrology department; • Dismantling and installation of temperature, pressure, differential pressure, flow and level gauges for calibration and inspection in the metrology laboratory; • Testing and setting-up operability of vibration, speed and static pressure gauges; • Maintenance of ultrasound, radar level gauges and ultrasound flow gauges, maintenance and inspection of louvres actuators on air coolers; • Inspection of valves operability (regulators, solenoids, positioners, limit switches, check valves, air filters) and functional testing; • Calibration and testing of methane, hydrogen sulfide, oxygen, carbon monoxide, hydrogen, sulfur dioxide and carbon dioxide gas detectors (F&G systems). Verification of the fire detection system operability; • Maintenance of video monitoring system and emergency alarm systems. Elimination of identified faults on all of the above types of work (operational duty personnel); • The configuration of instrumentation and automation protocol HART, Fieldbus, setting DCS and SIS systems, proksimetr’s under the compressors. • Maintenance of equipment: Siemens, ABB, Atlas Copco, Auma, Controlotron, Drager, Drexelbrook, Emerson-Fisher-Rosemount, Endress-Hauser, Fluke, KROHNE, Magnetrol, Metrix, Ohmart, Vega, Orbit, Wika, Yokogawa, Honeywell etc.; ACHIEVEMENTS: Promoted to the duty engineer on the night shift, recognised by the project managers as one of the most efficient engineers on site.
    • Август 2010 – июль 2011
    • 1 год

    Automation engineer

    Gazprom
    Gas Processing, Gas Extraction, Gas Transportation, Storage

    Обязанности и достижения:

    PROJECT: Central Asia-China main gas pipeline, Kazakhstan JOB DUTIES: • Construction of three bridges connecting the main gas pipeline "Kazakhstan-China" and "Bukhara gas area - Tashkent-Bishkek-Almaty" under the auspices of the JSC "Intergas Central Asia"; • Programming of controllers SIEMENS S7 (S-200, 300, 1200) within WinCC in STEP 7 package; • Designing in AutoCAD environments; • Conducting troubleshooting assignments and perform modifications; • Performing a variety of related functions such as Software procedure development, process debugging, System analysis, SCADA system configuration; • Deployment and testing, PLC application development, Windows Platform, Networking configuration and analysis, preparing the paperwork and maintaining records of activities; • Performing field service operations that may involve unusual problems requiring technical skills; • Conducting tests or modification of equipment and procedures; • Record, compile and reduce data for analysis and assist in related assessment and preparation of reports; • Design and Troubleshoot, applying own knowledge and experience to resolve problems; • Assist in planning and coordinating team efforts; • Ensuring that the entire Automation & Control System group is in full compliance with all Siemens Policies, Laws and Regulations including HSE requirements; • Awareness of the role of Siemens representative on-site and so responsible for ethical and responsible values that Siemens requires.
    • Август 2007 – август 2010
    • 3 года и 1 месяц

    IT engineer

    Impulse TV LLP
    System Integration, Technological and Business Processes Automation, IT Consulting, Satellite Communications

    Обязанности и достижения:

    PROJECT: IT support for O&G companies in Kazakhstan; JOB DUTIES: • Support of multiple systems for corporate users, including but not limited to desktop and notebook workstations but also tablet computers, LCDs, printers and other peripherals, phones and related systems, and a wide range of video conferencing equipment and systems; • Effectively executing the opening, follow-up, closing of IT service tickets; • Periodically report to the Team Lead on the team and individual work accomplishments, problems, progress in mastering tasks and work processes, and individual training needs; • Maintaining records of work accomplishments and administrative information and coordinate the preparation, presentation, and communication of work-related information to the Team Lead; • Other responsibilities may include: Inventory and asset management, conference room preventative maintenance, and e-recycling; • Inventory and asset management responsibilities include communicating, following up and maintaining good relationships with vendors, monitoring inventory to ensure it meets the upcoming needs, procurement, tagging and record-keeping for accurate tracking of assets, and repair and recycling of used assets; • Support a complex and fast-paced environment with outstanding attention to customer satisfaction; • Ensuring deliverables are prepared to satisfy the project requirements and schedule.

Условия занятости

  • Подходящие условия занятости
Вахта
В офисе/На объекте

Обо мне

Дополнительные сведения:

I started my career working as an automation engineer for the Central Asia-China gas main pipeline and progressed to a project management role. Throughout my career I have led on the delivery of high profile, high impact, global projects, I have driven the expansion of Project Management services across CIS, built high performing teams and delivered best in class project management solutions and human recourses. I am currently the Project Manager with over 12 years of experience initiating and driving Oil & Gas, Chemical & Petrochemical, Energy & Utilities, Power Generation, Pipeline & Infrastructure, IT, Engineering, PMC (project management consulting), Paper-and-pulp industry, Industrial automation projects through all stages of their life cycle in TOP Energy Companies: Schneider Electric, Siemens, Chevron, Shell, GAZPROM. Led a team of 60 members directly – construction, commissioning and maintenance teams, project & planning teams, financial and budget control team, sales and business development team, including contractors, vendors, general designers etc. (overall number - till 5000 of human resources - indirectly) and projects with an overall budget from 10M euro to 25B euro. I was a key stakeholder and took an active part in all phases of the life cycle of the project in multi-disciplines as such as Pre-FEED/FEED, construction, commissioning, start-up, maintenance/shutdown, and business development, furthermore as such as models of contract: EPC, EPCC, EPCm, PMC, MAC, LTSA, FIDIC (complying with FIDIC’s White Book) - call-off, reimbursable, lump sum, prices for measured work etc. Hands-on experience for implementation of maintenance activities to achieve zero downtime including Autonomous Maintenance, Lean Manufacturing. I was trained and certified in the field of engineering disciplines and standards in the United Kingdom, Russia, UAE. I would like to invite you to see my presentation of projects. It's interesting! Here is the link: https://drive.google.com/open?id=14cd-_jh7SeBEcXdqjPt5yqzb2f1jcjmj Project management,  EPC, EPCC, EPCm, PMC, MAC, LTSA,  DCS, SIS, ICSS, SIL,  Maintenance (incl. maintenance integrity execution) management,  Construction / Commissioning management,  Pre -FEED / FEED management,  Value engineering sessions,  SCRUM, AGILE, LEAN, ERP,  HAZID, HAZOP, SAFOP, RCA, BIM,  Oil & Gas - Exploration, Production, Processing, SCADA,  Primavera P6,  Gas/power turbines, pumps, compressors,  PDMS,  Permitting,  Sales and business development,  Operational excellence,  ISSOW L-2,  Shutdown, turnaround, modification,  Process Automation/instrumentation, SAP ERP, PMBOK, MS Project, Project plan, BOQ, Capex cost management, Project Statement, 3D & VR & Drones in construction, What-If project implementation scenarios

Иностранные языки

  • Английский язык — cвободное владение

Водительские права

  • B — легковые авто
Фото, имя и контакты доступны только авторизованным пользователям
Обновлено 10 декабряПоследнее место работы (11 мес.)Старший ассистент (Agile-координатор, Project Manager)Ноябрь 2024 – октябрь 2025
Обновлено 7 декабря
Превью фото соискателя
Project Manager-Desktop/Mobile/VR/Webз/п не указана
Последнее место работы (7 мес.)Технический директор (CTO)Март 2025 – октябрь 2025
Обновлено в 11:50Последнее место работы (1 год и 2 мес.)Руководитель проектаОктябрь 2024 – работает сейчас
Обновлено в 11:02Последнее место работы (4 года и 10 мес.)Руководитель направления внедрения цифровых проектовСентябрь 2020 – июль 2025
Обновлено 18 ноября
Превью фото соискателя
Project Managerз/п не указана
Последнее место работы (2 года и 3 мес.)Директор по стратегическому развитиюСентябрь 2022 – декабрь 2024
Обновлено в 10:10Последнее место работы (2 года и 8 мес.)Менеджер проектов / Руководитель группы разработкиЯнварь 2023 – сентябрь 2025
Обновлено в 10:20Последнее место работы (1 год)Руководитель проекта/ операционный консультант (фриланс)Декабрь 2024 – работает сейчас
Обновлено 13 ноябряПоследнее место работы (2 года и 7 мес.)Middle event managerМай 2023 – работает сейчас
Обновлено 29 ноября
Превью фото соискателя
Project manager100 000 ₽
Последнее место работы (2 мес.)Project manager / Product OwnerДекабрь 2024 – февраль 2025
Обновлено в 1:19
Превью фото соискателя
Project managerз/п не указана
Последнее место работы (2 мес.)Представитель банкаОктябрь 2024 – декабрь 2024
Работа в МосквеРезюмеКонсалтинг, стратегическое развитиеУправление проектами

Смотрите также резюме




Общество с ограниченной ответственностью «СуперДжоб» Г.Москва, ул. Дмитровка М, дом 20 ИНН 7702319337 ОКВЭД 63.11.1 vip@superjob.ru +7(495)7907277 Программа ЭВМ SuperJob и Программные модули включены в Реестр российского программного обеспечения (ПО), реестровая запись № 9280 от 20.02.2021г. Программный интерфейс API SuperJob включен в Реестр российского программного обеспечения (ПО), реестровая запись № 11081 от 20.07.2021г.
© 2000–2025 SuperJob