Обязанности и достижения:
The project included the design and construction of:
Full-cycle production line (built-up area of more than 154 ha)
Infrastructure facilities: 45 km high voltage line (110 kV), power substation 110/10 kV 63.3 MW, gas pipeline and gas distribution station, 12 km public railways and 9 km of on-site railways, Road 15 km class 2, quarry for mining for cement production (1200 ha)
• Management of the group are responsible for the design: own staff and subcontractors (local and foreign);
• Coordination of work between subcontractors;
• Control of the construction process;
• Organization of the archive of documentation (electronic and paper);
• Settlement of issues with controlling organizations;
• Interaction with Federal and regional authorities on the construction of the plant;
• Conducting negotiations to complete the construction of the plant, concluding an EPCM contract with HY (China), Interacting with foreign suppliers and contractors.
• Resolving issues related to the adaptation of foreign projects to Russian conditions (including climate) and regulatory requirements.
• Electronic databases of technical documentation have been implemented at all sites.
• Justification and modification of solutions proposed by FLSmidth and Kottmann, which reduced the cost of projects.
• Projects received a positive opinion from GLAVGOSEXPERTIZA (the main state expertise), as well as other expert organizations.