Обязанности и достижения:
Sr. Industrial Project Manager | Program Manager (Manufacturing)
Dec 2022 - Present · 1 yr 2 mosDec 2022 - Present · 1 yr 2 mos
Material design team leader
• 3D printing material Industrialization to achieve 2Kt of the annual production;
Project management:
• Implemented Agile methodology in a research and development cluster consisting of three teams (approximately 30 engineers), resulting in significantly reduced product development cycles and increased overall efficiency;
• Hazardous assessment of the production area based on ASTMs, NFPAs, and NOMs requirements;
• Leading the project of the Installation and commissioning of the Industrial painting booth and drying chambers;
• Leading the project of the Dust collection system integration in the machining areas (21K CFM) with dischargers and flame arrestors and integrated fire sprinkler system;
• Leading the Pilot composite construction material production line arrangement for RnD activities;
• Leading the project of the industrial Material production line development for regular operation (20 kTon annual capacity);
Program management:
• Alignment of the manufacturing cluster teams on targets
• The arrangement of the communication of the cross-functional teams to get timely updates and decision-making.
• Program risk identification
Sr. Industrial Project Manager | Program manager (Factory start-up)
Nov 2021 - Dec 2022 · 1 yr 2 mos
• I've been managed the site layout design for optimal operation sequences;
• I've been established partnerships with local vendors crucial to project success;
• Negotiated favorable lease agreements for the new facility;
• Executed strategic and tactical recruitment;
• Tenant Improvement (TI) Construction Management:
• Organized the inner construction process for a 5,000 sq. m. space (53,000 sq. ft.);
• Oversaw general contractor management, handling projects exceeding $3+ million (USD);
• Managed the arrangement of a 1000 KVA power connection + grounding and lightning arrestors.
• Successfully executed the construction of a compressed air supply grid and compressor room (5m3, 8 bar), including start-up operations;
• Managed the construction of the office area accommodating over 40+ seats;
• Coordinated the seamless connection of utilities to the production cells: 3D printing, machining, finish coating, drying, and PU foaming;
• Proactively managed of the deployment of the EHS area;
Sr. Industrial Project Manager (NPI)
Nov 2020 - Nov 2021 · 1 yr 1 mo
• Development of new construction technologies based on additive manufacturing.
• Led as PM the construction of the first full-fledged prototype of the house (864 sf.) that consists of a 3D printed envelope;
• Creating the complex set of Know-How technologies into a straightforward technological process;
• Development of the suppliers and vendors to ensure the prototype construction process;
• Integration of the prefabricated modules/units/components into building construction;
• Adaptation of the created technology for FBH certification (Factory-Built Housing Standard, California). Certificate obtained.