Москва
Резюме № 48474778
Обновлено 16 декабря
no-avatar

Pre-Commissioning / Commissioning engineer / specialist / supervisor / operator

Был вчера в 16:40
По договорённости
49 лет (родился 04 января 1976)
Москва
Условия занятости
Полная занятость
Стандартный график
В офисе/На объекте
Гражданство
не указано
Контакты
Телефон

Почта
Будут доступны после открытия
Профессиональные навыки
  • Показать еще
Фото, имя и контакты доступны только авторизованным пользователям

Опыт работы 26 лет и 7 месяцев

    • Январь 2025 – работает сейчас
    • 1 год

    Process manager

    Lukoil engineering , Москва

    Обязанности и достижения:

    To develop FEED, PRE-FEED, DD, EPC stages of projects (for LNG, crude oil field/gas, DECARBONISATION units, CPF, GPU, etc.) to prepare HMB, UTILITY CONSUMPTION, chemical consumption, philosophies, process description etc. to communicate with sub-contractors, to communicate with client team for process questions.
    • Декабрь 2020 – январь 2025
    • 4 года и 2 месяца

    Process engineer

    Nipigas , Москва

    Обязанности и достижения:

    To prepare FEED, PRE-FEED, DD, EPC, of LNG, CRUDE OIL, NATURAL GAS, CO2 (DECARBONISATION) PLANTS. to develop HMB, PROCESS DESCRIPTION, UTILITY CONSUMPTION, PFD, PID, etc.
    • Март 2020 – декабрь 2020
    • 10 месяцев

    Commissioning and startup Manager

    KMPA
    Construction stage of crude oil field.

    Обязанности и достижения:

    Managing of commissioning/startup activities on the oil field. To develop commissioning/startup plan, procedures, and etc. To check contractors activities, plans, procedures etc.
    • Август 2019 – март 2020
    • 8 месяцев

    Senior process engineer (engineering phase)

    "GTM-ONE" methanol plant
    FEED stage of methanol production plant

    Обязанности и достижения:

    To check pre-FEED/FEED documentation for new methanol plant from client side. The project is to design plant to produce methanol from natural gas (Fisher-Tropsh process) Haldor Tapsoe lycenser technology. The engineering company is Mitsubishi heavy industry. To check design documentation, to make process model in aspen hasys to check process calculation, to check and clarify all process questions. To prepare check CAPEX for final investment decision. To organise tendering for methanol plant construction and designing. Technical support of tendering and other activities of the project. It was It was short term contract for FEED stage.
    • Январь 2019 – июль 2019
    • 7 месяцев

    Production Planning Engineer

    Salym Petroleum Development

    Обязанности и достижения:

    To plan construction, maintenance and intervention activities on the crude oil field.
    • Май 2018 – январь 2019
    • 9 месяцев

    Commissioning supervisor

    SAIPEM, Москва
    Construction, commissioning and start-up of oil and gas plants at the "SOCAR" refinery

    Обязанности и достижения:

    Supervision of pre-commissioning /commissioning activities of refinery and crude oil jetty. (It was short term contract for commissioning stage period).
    • Январь 2017 – январь 2018
    • 1 год и 1 месяц

    Shutdown Coordinator

    YAMAL LNG, Москва

    Обязанности и достижения:

    The main targets of the position are to prepare process isolation of equipment, to plan and to coordinate LNG plant shutdowns. Preparation of equipments and systems isolations.
    • Апрель 2015 – январь 2017
    • 1 год и 10 месяцев

    Head of operation training

    Обязанности и достижения:

    Managing technical instructor team to train and assess LNG plant Operation technicians. To organise operation training system to prepare operators for new LNG plant. Gas treatment technology modules preparation to train operators of LNG plant. To prepare training and assessment materials, such CAP (Competency assurance program), VOC (verification of competency), Traineeship program, Work books for trainees, PST (process special training) to organize assessment for operators ensure that all trainees and experienced operators are ready to start up the LNG plant. To train 3 types of operators, such as: trainees operators, oil and gas experienced operators (without LNG experience) and panel operators. Budget planning for training department, etc.
    • Октябрь 2013 – декабрь 2014
    • 1 год и 3 месяца

    Commissioning Superintendent-process (Commissioning Discipline Leader – process)

    SNC Lavalin/TOTAL E&P Russia, Москва

    Обязанности и достижения:

    Pre-commissioning/commissioning of "TOTAL"company "Kharyaga"project Phase 3. Preparation and Execution Pre-commissioning/commissioning according company standarts. writing (OTP) Operation Test Procedures and etc. Pass OPERCOM training: Commissioning/Pre-commissioning preparation and execution philosophy. The project of phase 3 is postponed by TOTAL company in the end of september.
    • Октябрь 2012 – сентябрь 2013
    • 1 год

    OR&A engineer at offshore

    "AGIP KCO", Атырау

    Обязанности и достижения:

    Operation readiness and assurance engineer at commissioning stage. everyday followed up SUVC (Start-Up Verification Certificates) progress, organized meetings with head of disciplines to update Offshore Site Readiness Plan in the Microsoft Project file. Made walkdown of units for checking to prepare punch list. Checked SUVC (PRAC - Pre-Requisite Assurance Criteria), check in ACS system all associated documents to confirm that everything are prepared correctly for start up.To update all information in the document register. Communicated with Project Department to clarify all raised questions.
    • Ноябрь 2011 – сентябрь 2012
    • 11 месяцев

    Production Engineer (GTU and LNG)

    "SHTOKMAN DEVELOPMENT AG", Москва

    Обязанности и достижения:

    FEED stage of the project (LNG plant of “SHTOKMAN DEVELOPMENT AG”), Pre-operation activities, Preparation documents for FEED stage, Communication with designing companies, Revision of Operation philosophy, preparation of work instructions, Revision of HAZOP for GTU. Revision of P&ID (piping and instrumentation diagrams). Participate to negotiation with Contractors. Participate to the definition of: - The Operating Philosophy of the onshore facilities; - The winterization requirements; - The technical requirements for development and deliverable of equipment; - The Field Operation softwares to be implemented during the Operations phase - The handling philosophy; - The mechanical isolation philosophy; - The process equipment sparing philosophy; - The operator training requirements; - The site infrastructure – buildings locations, contents and design. Participate in: - Documentation review and verification. At the design stage, I was responsible for the interaction with the contractor organizations, co-ordination, to check the technical documentation and support of the project treatment plant and receiving a positive opinion on Glavgosexpertiza. Participation in tender commissions EPC contractors. The project was stopped.
    • Октябрь 2006 – ноябрь 2011
    • 5 лет и 2 месяца

    Multidisciplinary Lead operation technician field process

    "SAKHALIN ENERGY" LTD, Южно-Сахалинск

    Обязанности и достижения:

    Principal duties: - During the construction phase I was responsible for erection supervision conduct, interaction with contractors. - To work in pre-commissioning, commissioning and start-up of LNG plant process (acid gas removal unit, dehydration unit, mercury removal unit, liquefaction unit, fractionation unit, tampering cooling water unit).Preparation of work instructions for start-up and shut down of LNG plant on process side. Checking and inspection of contractors job; - Coordination of pre-commissioning, commissioning, shut down and startup at the process side of LNG plat. I was AA (area authority on site) to coordinate maintenance activities of contractors; - Working with permits to work (preparation, verification, issue, authorization, preparation of isolations of equipment); I’ve done translation of PTW (permit to work) from English to Russian. - Develop the necessary documentation to stop the factory for overhaul, and after major repairs to the launch. Participation in all the shut downs and start up of the plant. - Participate in the preparation instructions for stopping, starting and operating a plant for liquefying natural gas. - I made isolation of equipment (purging, draining, venting) with preparation Isolation Control Certificates and Permit Control Certificates; - taking part in start up and shut down of LNG plant; - Perform communication between departments. - I watched the work of process equipment. Working by safety officer on the LNG plant (observation area for safety, checking PTW on site during ongoing activity). - supervise and adjusting of LNG plant start up to control and regulate compressors working on MARK 6. - Manage a team of process operation technicians on shift (4-6 operators) to ensure that the LNG plant is operating in safe, efficient and reliable manner under normal, upsets and emergency situations to meet the business requirements for the production of LNG and LPG. - Maintain, review and implement operations Work Instructions (WI). - Coaching a team of process junior operation technicians. - Perform safe and efficient shutdown/start up activities as per WI, Shift Supervisor/panel and man daily instructions. - I’ve got AA (area authority) and worked by Supervisor to be on stand-by. - Taking part in commissioning activities (witnessing, punching, pre-start up activities) for all equipment within LNG process areas. - Report any integrity/reliability issue from site with SAP, or near miss report. Write clear SAP notifications. - Check and countersign all Work Control Certificates/Tool Box Talk Forms that are to be, or have been issued within all process areas of accountability prior to the commencement of any activity under the control of a WCC (the final signatory to allow work to proceed). - Report any non-compliance to line, hazard, STOP, Incident reports. - Ensures that plant integrity is maintained and that risks associated with all work are managed to a level As Low As Reasonably Practicable (ALARP). Comply with PTW (permit to work) system. - Responsible for testing for the presence of flammable vapors, toxic gases and oxygen as required in support of WCCs that require a L2RA or Confined Space Entry Certificates as requested by the AA. - Participated in the commissioning of gas turbines and compressors; • During the overhaul I have supervised repairs of compressors (gas turbine drives) and gas turbines of "NP General electric" company. - Responsible for all Process isolations. Entering and acknowledging the points of isolation in the related ICC in ISSoW. -Ensure good housekeeping of plant area. - Trouble shoots process upset, identify causes and corrective actions. - Perform the role leader of the emergency duty team in the event of any emergency. Achievements • I have studied all units of liquefaction of natural gas plant, Receiving qualification of Lead operation technician of LNG plant. • Pass training to operate LNG process on DCS panel; • I passed supervisor essential training.(effective team management) • Pass Firefighting training in Johor Bahru (Malaysia) as "Emergency team Leader"; • Pass English language course “Upper intermediate level”; • Practice in English language in the international team.
    • Декабрь 2004 – сентябрь 2006
    • 1 год и 10 месяцев

    Shift supervisor of Claus sulfur plant

    «Petroleum Company «Rosneft’»- Komsomolsk Refinery plant», Комсомольск-на-Амуре

    Обязанности и достижения:

    Principal duties: - During the construction phase I was responsible for erection supervision conduct, interaction with contractors, preparation turnover documentation, preparation of certificates for pipes and pressure vessels, and transfer it to the RTN. - To arrange of starting – up and adjustment works. - coordination of pre-commissioning, commissioning and startup of Claus sulfur unit; - Develop the necessary documentation to stop the factory for overhaul, and after major repairs to the launch. Participation in all the shut downs and startup of the plant. - Participate in the preparation instructions for stopping, starting and operating of Claus sulfur unit. - worked by Lead Shift Supervisor to be on stand-by; - I operated process of Claus sulfur plant on DCS panel adjusting temperature, pressure, flow rates on the units with management of shift of plant. - On the installation of Claus sulfur plant: I watched the installation’s regime, with the adjustment of the parameters according to laboratory analysis. - I watched the work of process equipment with communications with other departments to maintain it safety operate; - I controlled the installation’s temperature regime: reactors, furnaces, separators. - I distributed the work between the installation’s nonacademic personnel (operators and engineers). - preparation of work instruction for Claus sulfur plant. - Perform communication between departments. Achievements • I have studied all units of Claus sulfur plant. • Receiving qualification of Shift supervisor of Claus sulfur plant. • Probation on Nignekamsk Oil Processing Factory.
    • Декабрь 1998 – декабрь 2004
    • 6 лет и 1 месяц

    The senior operation technician process of catalytic reforming plant

    «Petroleum Company «Rosneft’»- Komsomolsk Refinery plant», Комсомольск-на-Амуре

    Обязанности и достижения:

    Main duties - During the construction phase I was responsible for erection supervision conduct, interaction with contractors, preparation turnover documentation, preparation of certificates for pipes and pressure vessels, and transfer it to the RTN. - To arrange starting – up adjustment works. - working in pre-commissioning, commissioning for catalytic reforming. Develop the necessary documentation to stop the factory for overhaul, and after major repairs to the launch. Participation in all the shut downs and startup of the plant. - Participate in the preparation instructions for stopping, starting and operating of the unit. - On the installation of catalytic reforming: I watched the regime of installation, with the adjustment of the parameters according to laboratory analysis. - I controlled the temperature regime of installation of reactors, furnaces, separators. - I operated process of catalytic reforming on DCS panel adjusting temperature, pressure, and flow rates on the units. - I have worked and operated with compressors: centrifugal and piston. - Centrifugal compressor with steam turbine. I handled the pressure of hydrogen gas, which is created by compressors. - I handled the steam’s pressure which goes on the steam turbine. - I controlled the steam making on the boilers of the warmth’s utilization, the smoking gases from furnaces. - I distributed the work between the installation’s nonacademic personnel (operators and engineers). - I worked on commissioning of compressors, waste steam reboilers and all units of refinery plant. - I managed of all blocs of installation of catalytic reforming. Including: stabilization, hydro cleaning, reforming, and steaming out, boiler - preparation of work instruction for catalytic reforming plant. - Perform communication between departments. Achievements • I have studied all units of Catalytic Reforming. • Receiving qualification of senior operation technician of Catalytic Reforming units. • Probation on Khabarovsk Oil Processing Factory.

Условия занятости

  • Подходящие условия занятости
Полная занятость
Стандартный график
В офисе/На объекте

Образование

Обо мне

Дополнительные сведения:

2012 The course of "Project management based on standard ANSI PMI PMBoK v.4» Training center "Specialist" at Bauman Moscow state Technical University, certificate of the "Project management based on standard ANSI PMI PMBoK v.4» 1998 - Seminar in the Yekaterinburg Institute of the guard of labor, to arranging and final composition of the attestation working places. 2000 Khabarovsk Refinery plant. Installation catalytic reforming. 2004 Nizhnekamsk Refinery plant. Installation of sulphur manufacturing. 2007-2008 "FGOU SPO Sakhalin fuel-energy college" Pumps mechanical technician 2007-2008 "FGOU SPO Sakhalin fuel-energy college" Compressors mechanical technician 2007-2008 "FGOU SPO Sakhalin fuel-energy college" Lead operation technician 2007 Petrotechnics. ISSOW course. (to operate Permit to work system) 2008 Region RTN committee. Yuzno-Sakhalinsk. Confirm qualifying categories for operation of technological processes, pump units, turbine and compressor units. 2008 Region Emercom School. Yuzno-Sakhalinsk. Emergency responder training for Rescue Officer. 2008 SAP system training (to make SAP requests) 2009 Course supervisor essential (7 modules of effective management training) 2009 DCS operational training 2009 SAP. SAP system training. 2010 Malaysia, Johore Bahru, MSTS ASIA, Safety Training Course: Offshore Emergency Response Team Leader (OPITO Approved). Member of Falck Nutec. 2018 BOISET/HUET. To escape from sinking helicopter. Компьютерные навыки: Microsoft Office Project, WORD, EXEL, POWER Point, ISSOW, ICAPS, ACS, IMIS, SAP, SHTORM, DIRECTUM; PRODOM; AutoCAD, EDMS (doc control system).

Иностранные языки

  • Английский язык — cвободное владение

Водительские права

  • B — легковые авто
Фото, имя и контакты доступны только авторизованным пользователям
Похожие резюмеВсе 92 похожих резюме
Обновлено 25 ноябряПоследнее место работы (1 год и 11 мес.)Инженер машинного обучения / ML EngineerСентябрь 2023 – август 2025
Обновлено 1 декабря
no-avatar
Engineer140 000 ₽
Последнее место работы (18 лет и 12 мес.)EngineerЯнварь 2007 – работает сейчас
Обновлено 5 октябряПоследнее место работы (4 года и 2 мес.)Quarry representative, Chief system application specialistЯнварь 2012 – март 2016
Обновлено 2 июляПоследнее место работы (6 лет и 5 мес.)Ведущий инженер-разработчик / Team LeadИюль 2019 – работает сейчас
Обновлено 1 марта 2022Последнее место работы (14 лет и 2 мес.)Главный инженерОктябрь 2011 – работает сейчас
Обновлено 1 декабря 2012Последнее место работы (14 лет и 10 мес.)Сервис-инженер, service operating engineerМарт 2011 – работает сейчас
Обновлено 30 августа 2013Последнее место работы (14 лет и 5 мес.)Engineer, Bodyshop engineering departmentИюль 2011 – работает сейчас
Обновлено 26 июля 2017Последнее место работы (4 года и 5 мес.)Laboratory technologistОктябрь 2004 – март 2009
Обновлено 13 января 2019Последнее место работы (7 лет и 10 мес.)PLC/HMI EngineerФевраль 2018 – работает сейчас
Обновлено 25 октября 2017Последнее место работы (9 лет и 10 мес.)Hardware engineerФевраль 2016 – работает сейчас
Работа в МосквеРезюмеПромышленность, производствоПромышленное оборудованиеSupervisor

Смотрите также резюме




Общество с ограниченной ответственностью «СуперДжоб» Г.Москва, ул. Дмитровка М, дом 20 ИНН 7702319337 ОКВЭД 63.11.1 vip@superjob.ru +7(495)7907277 Программа ЭВМ SuperJob и Программные модули включены в Реестр российского программного обеспечения (ПО), реестровая запись № 9280 от 20.02.2021г. Программный интерфейс API SuperJob включен в Реестр российского программного обеспечения (ПО), реестровая запись № 11081 от 20.07.2021г.
© 2000–2025 SuperJob