Обязанности и достижения:
My responsibilities were:
- Conduct all aspects of project life-cycle from writing proposals for new projects and creating design specification to development application software for automation systems, commissioning, testing and handing over systems to the operation. Providing support for customers post completion.
07/2015 to 07/2016
On the ALT (arctic tower-type terminal) “Novy Port” project, I was involved in commissioning offshore systems for GAZPROMNEFT-YAMAL LTD.
My background includes:
- Inspection of the object technical readiness on-site and participation in FATs with customer on-site in Abu Dhabi (UAE) before shipment to Yamal;
- Design commissioning and SAT programs in coordination with management service of customer and project team;
- Commissioning PLC\SCADA (S7-400H\FH, S7-1200, Wonderware SP2014R2) for offshore part of PCS, ESD and F&G systems;
- Loop-testing, setting up required commissioning documentation, coordinating and direction engineering team on the arctic terminal;
- Commissioning and conducting SAT of offshore equipment (HVAC\PAGA\CCTV\HV\LV\UPS\Lightning\Heating\Telecom\Meteo\Navigation);
- Reporting (test protocols and SAT signed by customer, daily progress report) and the preparation of executive documents;
- Training for maintenance team.
06/2013 to 04/2015
On the GKSVD (gas high-pressure compressor station) project, I was involved in commissioning systems for ROSNEFT-VANKOR LTD.
My background includes:
- Commissioning PLC\SCADA\HMI\DB (ControlLogix5570, Factory Talk SE\ME, MS SQL) for DCS, ESD, F&G systems, Integration with EXTERRAN DCS;
- Commissioning CCTV, PAGA, HVAC, Access control, Telecom systems, configuration network equipment;
- Design SAT program for F&G and access control systems in coordination with management service of F&G and Security;
- Conducting SAT and hand over all systems to the operation, maintaining the documentation (red mark drawings, as-build, etc)
- Reporting (test protocols and SAT signed by customer, daily progress report) and the preparation of executive documents;
- Coordinating and direction engineering team, supervision of work done by subcontractors;
- Regular participation in briefings with customer and subcontractors teams.
10/2012 to 05/2013
On the projects of Lease Automatic custody transfer unit (LACT) “PRIME-ISKRA” based S7-300, S7-400, my experience includes:
- Tested channels and organized Metrological certification LACT “PRIME-ISKRA” for TAMANNEFTEGAZ CJSC.
- Troubleshooting and integration LACT “PRIME-ISKRA” with existing DCS on TSB1 for GAZPROMNEFT-ONPZ LTD.
- Sampler programming of LACT “PRIME-ISKRA” on NPZ for TULANEFTEPRODUCT LTD.
07/2012 to 09/2012
On the project for NPZ NOYABRSK (GAZPROMNEFT-TUMEN LTD), my experience includes:
- Development of engineering solutions for DCS application software upgrade includes installation new equipment on NPZ NOYABRSK;
- Development changes in application of SCADA (Wonderware InTouch with OPC) for monitoring and controlling work of new equipment.
- Commissioning and SAT with customer maintenance team, setting up the required commissioning documentations.