Обязанности и достижения:
- 2003 to present:
Task Manager of Process Development and Scale-Up Task on Russian Chemical Weapons Destruction Program (RCWDP). Located in Moscow and Shuch’ye, Kurgan region, Russia. The RCWDP project is a Task Order Contract with the US Army Corps of Engineers to provide program management for the design, procurement, construction, and start-up of a chemical weapons destruction facility. The Scale-Up Task is a part of the project to design agent destruction process and develop this process with scaled testing. Responsible for overall management of the all task activities. This activities include design and fabrication for process test facilities, development of agent destruction process stages, performing scaled testing, scaled facility design, site survey work, construction, and on-site air monitoring studies. The following technological processes were subject to development and experimental verification: detoxification of organo-phosphorous CA (GB, GD, VX and viscous VX), bituminisation of reaction mass received from detoxification experiments, waste waters treatment, production of RD-4M decontamination solution used for VX and viscous VX detoxification. Correspondently four specialised facilities were designed and constructed.
The results and recommendations from Scale-Up task activities provided input to the final design of the process and facility, and also to the operational and safety procedures that will be implemented during real full-scale facility operation.
The work is being performed by number of Russian, US and European subcontractors. The overall task budget is above $ 16,000,000.
- 2001-2003 - Deputy Task Manager.
As Deputy Task Manager of Scale-Up Task I shared responsibility with task manager for overall management of the all task subcontractors. In particular I was responsible for the construction, equipment installation, systematisation, turn-over and agent destruction experiments at the scaled detoxification test unit located inside Shuch’ye CA weapon storage area. Under Scale-up task at this unit ~130 kg of Russian Phosphor-organic Chemical Agent (GB, GD, VX and viscous VX) was successfully and safely destructed first time at the hall project.