Обязанности и достижения:
Project: Construction natural gas plant, treatment, liquefaction, offloading gas condensate (LNG). Yamal/Singapore
• Review and digest the pre-project studies within appointed project
• Verify the deliverables to be produced by the Contractor (s) related to E&I discipline
• Coordinate and supervise Electrical studies within appointed project
• Check that the design is developed in line with the Pre-Project and the Statement of Requirements
• Ensure coordination of Electrical activities with the other Specialists within the project team. Ensure global consistency of the design
• Ensure update of the electrical equipment maintenance documentation and as-built documentations and their compliance with the requirements of the Russian Federation;
• Check design As Build Drawings and provide input into Livelink via Doc-ument Control administration.
• Technical support to Construction and Commissioning teams.
• Prepare and check documentation as related to repair and maintenance of electrical equipment;
• Participate in weekly and monthly progress meetings;
• Provide input to the Project Manager and Head of Electrical for Electrical progress reporting (data, narrative), highlight critical problems and pro-pose corrective actions;
• Participate to Technical Reviews/Audits. Ensure follow-up and implemen-tation of outcome;
• Comply with SEIC procedures for Contractors HSES Management;
• Execute relevant activities of OPF HSE Plans;
• Follow-up Contractor (s) activities. Control and comment all Electrical documentation issued by contractor (s) related to engineering, procure-ment, project management, fabrication and tests, and check that they are as per Company specifications and rules. Review and answer to the En-gineering Queries and Requests For Waiver;
• Quality control and documentation of work performed at the stage of EPC and FEED.;
• Control over budget spending
• Progress control
• Awaring of client needs and focus on client satisfaction.
• Carry out any duties which your line manager may reasonably request within the broad parameters of your role.
• Responsibility for the technical part of the tender •Review and comment engineering plans;
Design abilities:
• Lead to the design development within a multi-discipline engineering team;
• Design of substations 110/35/10/6/0.4 kV;
• The basic single-line diagram;
• Layout of electrical equipment and laying of cable lines;
• The scheme of internal and external power supply;
• Motor control center;
• Emergency power supply system;
• Uninterrupted power supply, diesel generator sets;
• Cable schedule;
• Calculation of electric loadings, currents SC
• Calculations of cables, short-circuit currents;
• Grounding and Lightning protection;
• Internal and external lighting.
• Access control, CCTV, and COC system;
• F&G (Fire and Gas system), SKUD (Access contol system, SСS (Structure cable system), BMS (Building management system) SOS (Security alarm system)
• PLC programming (Siemens 1500 TIA Portal and S7 300/400)
• Fire Detection and Alarm Systems (Incl. Voice Alarm)
Internal General and Emergency Lighting Calculations
• Electronic testing equipment such as secondary injection set for relay testing; protocols such as S7, Profibus and IEC61850; SCADA and PDCS; UPS systems; VSDS and VFD systems; generator con-trols; electrical protections.