Обязанности и достижения:
- QA & QC for project «Conversion of Vladivostok TPP-1 and 2 to gas»;
- Survey of building structures;
- Evaluation of the technical condition of buildings;
- Design of projects for reinforcement and restoration structures;
- Calculations of the residual life of buildings;
- Technical control of construction and installation works during the project «Conversion of Vladivostok TPP-1 and 2 to gas» (technical supervision of the client);
- Verification of as-built documentation including acts of hidden works and critical structures acceptance for project «Conversion of Vladivostok TPP-1 and 2 to gas»;
- Participation in acceptance commission with Contractor and Client for project ««Conversion of Vladivostok TPP-1 and 2 to gas»;
- Management of control of welding, coating of gas pipelines, tanks for fuel oil and steel structures.
- Carrying out «industrial safety expert review» of buildings and structures at «hazardous production facilities»: Boiler frames, foundations for equipment, buildings (brick, reinforced concrete, steel frame, trusses), crane rails, chimneys, steel tanks up to 50000 m3;
- Carrying out «industrial safety expert review» of the main buildings of the central heat station (buildings dimensions 470x150x50m (h)), in the entire Far East. For example some main big station - Khabarovsk TPP-1, Vladivostok TPP -2, Khabarovsk TPP -3, Komsomolsk TPP-1,2,3, Yuzhno-Sakhalinskaya TPP, Kamchatskaya TPP-1,2 Chegdominskaya regional power station and other sites;
- Making industrial safety expert review and writing conclusions of building and construction, following the further approval by Rostechnadzor.
- In close collaboration with Rostechnadzor reps on industrial safety expert review conclusions issues.
- Cost Estimation;
- Briefing the customers and giving presentations on the progress of the ongoing projects;
- Deputy head of Department during the period of head's absence.
- Progressed from the engineer of the 2nd category to the chief specialist of the survey of buildings and structures.
- Optimised workflow by creating a unified documentation system.
- Successfully carried out «industrial safety expert reviews» and survey more than a hundred projects in the entire Far East in more than 20 cities and towns.
- Work on large projects with various contractors.
- Played main role in large projects at the facilities of the «Ministry of power », « RusHydro» throughout the Far East.