Обязанности и достижения:
Organized, tracked/scheduled and participated in maintenance of plant utility systems, including power, heat, water, ventilation and sewer systems.
Analysis of full plant supply power network, power supply losses elimination.
Delivered several energy saving project including replacement of internal and external lighting system, hot water distribution, power stabilization project.
Power system fault, selectivity and flash hazard studies preparation. Implementation of electrical safety system at plant level as a benchmark reapplication from other European and American manufacturing plants. Dealing with different Ukrainian power supply authorities related to permission for equipment start-up, monthly reports preparation, audits visits, outages and incidents reports.
Responsible for relations with local power companies.