Обязанности и достижения:
Quality Assurance and Quality Control Engineer
Jordan Atomic Energy Commission/ Jordan Research and Training Reactor: it is the first Research Reactor in Jordan.
Quality Department, Staff of Quality Department consists of 5 persons.
ACHIEVEMENTS:
Requirements
• Monitored production department to obtained certificate ISO 9001 for product Iridium-192 radio-isotope.
• Participated in achievements the Jordan Food and Drug Administration (JFDA) requirements for production the iodine- 131 radio-isotope.
Quality Control
• First implementer of QC activities in Jordan Research and Training Reactor (JRTR).
• Enhanced commitment in implementing surveillance and periodic plan.
• Conducted more than 200 over-sites in JRTR activities during 2 years.
Procedures and Analysis
• Initiated Risk Assessment methods procedure in JRTR.
• First analysis and issuing trends related to Quality Management System.
• Reviewed and improved Non-Conformance Request procedure to reflect real situation.
• Reviewed and improved more than 60 operation procedures as QA reviewer in 2 years.
• Issued Quality Control Requirements Procedure for JRTR laboratories.
JOB DESCRIPTION:
Quality Control Activities:
• Records product inspection results, complete related documentation, and perform data entry and transactions after completion of inspection.
• Responsible for the identification and control of nonconforming product, and the maintenance of equipment calibrations.
• Reviews and verifies internal and external qualifications of suppliers, welders, NDE personnel with regard to Non-Destructive Examinations (NDE), welding procedures and/or other applicable requirements.
• Follows-up the supplier evaluation with JRTR’s departments
• Maintain all records relevant to purchasing process (tenders, purchasing orders…etc) and ensure that the List of suppliers is up to date.
• Coordinates quality assurance functions within JRTR, and with groups external to the project providing project support.
• Assures that all requirements of quality documentation have been met, i.e. purchase orders, inspection plans, drawings, etc. and Initiates traceability and maintain the required records and drawings.
• Works in collaboration with JRTR department in the subcontracting process and ensures that the orders are approved and confirm their technical specifications
Quality Assurance Activities:
• Reviews and comments on the corrective action review report issued by the audit team leader.
• Tracking the Corrective Action process and the condition report.
• Coordinates with Quality manager to prepare and define test and inspection requirements for the required projects such as ITP and procurement specifications;
• Ensures quality control policies and procedures are followed and demonstrates the understanding of a Nuclear Safety-related Quality Program and its requirements.
• Verify the adequacy of JRTR quality related procedure, oversee the quality assurance program documentation, coordinate with JRTR various department on needed quality related documentation and procedures, and report to QA/QC Manager.
• Assuring ongoing compliance with quality and industry regulatory requirements.
• Assist in preparation for the annual management review meeting with JRTR top management with related agenda and material that will be used in the meeting.
• Issuing the minutes of meeting for the annual review meeting with the action item list and distribute it to the concerned directors and JRTR staff and following up the accomplishment of the action items.
• Trains new JRTR personal on quality and ISO requirements.
Audit Activities:
• Plans and conducts quality assurance audit in all JRTR processes (management, financial and logistics, HR and training, technical support, maintenance, safety, radiation protection and environment production, utilization, ware house, purchasing and procurement and customer support and satisfaction) and report findings to senior management to ensure the implementation of the quality management system requirements in JRTR.
• Identifies resources necessary for conducting the annual internal audit.
• Reviews and comments on the corrective action review report issued by the audit team leader.