Москва
Резюме № 48732444
Обновлено 26 июня 2020
Превью фото соискателя

Electrical Engineer

Был больше месяца назад
130 000 ₽
50 лет (родился 01 апреля 1975), cостоит в браке, есть дети
Санкт-Петербургготов к переезду: Москва
Занятость
полная занятость
Гражданство
Россия
Контакты
Телефон

Почта
Будут доступны после открытия
Фото, имя и контакты доступны только авторизованным пользователям

Опыт работы 28 лет и 1 месяц

    • Июнь 2017 – работает сейчас
    • 8 лет и 6 месяцев

    PCC Electrical Supervisor

    Обязанности и достижения:

    Training subcontractor’s employees for pre-commissioning and commissioning (PCC) works of Raychem (EHT & other equipment). Supervision of PCC of subcontractor’s personnel. Compliance with the requirements of safety regulations and control over their observance by subcontractor. Contacting with the client’s representatives on behalf of Pentair for quick issues solving and prompt responses to requests. Setting the parameters of NGC-20 (New Generation Controller 20) Pentair controllers that control operation modes of EHT and energy saving. Commissioning works on setting up the RS-485 network connecting the NGC-20 controllers to groups (loops) using Modbus protocol. Commissioning works of CPZ control panels installed in electrical substations that monitor controllers and control heat trace field power panels. Testing the connection between LV (low voltage) distribution boards and CPZ panels in substations. Testing the connection between CPZ panels and the plant’s power distribution control system (PDCS). Conducting functioning tests of equipment. Checking the fiber optic lines connecting all CPZ panels into a single network - CBB (the main control room of the Yamal LNG plant). Preparation of daily progress reports and test reports.
    • Январь 2017 – июнь 2017
    • 6 месяцев

    Duty electrician of substations 220kV/10kV POLUPROVODNIKI, PROSPEKT ISPITATELEY, PARGOLOVO

    FEDERAL GRID COMPANY OF UNITED ENERGY SYSTEM

    Обязанности и достижения:

    Daily inspections of 220 kV gas insulated substations (HYUNDAI, SIEMENS). Operational switchings in distribution bords of substations. Equipment preparation for maintenance or repair. Giving approval to maintenance teams according to their permits to work.
    • Декабрь 2014 – сентябрь 2016
    • 1 год и 10 месяцев

    Method support Electrical Engineer

    WOOD GROUP PRODUCTION SERVICES NETWORK

    Обязанности и достижения:

    Remote technical support for WOODGROUP PSN electrical staff performing maintenance on CPF and remote pads of Kharyaga oilfield (Nenets Autonomous District), according to GMS contract with TOTAL. • Development and drawing up of instructions for operation and maintenance of equipment and its repair. • Organization, coordination and implementation of the time scheduled maintenance and repair of the process equipment using a program SAP PM SALSA. Checking and correction of maintenance strategy (frequency, man-hours, scopes of work etc.) • Maintaining the required number of spare parts and materials according to storage standards, using the program SAP MM SALSA. Compiling lists of absent spare parts and necessary materials, placing orders for their purchasing and delivery (creation of MMRF to assign codes to new materials, attachment of materials to corrective work orders). • Extraction of statistical data from SALSA on materials, maintenance dates for particular equipment, number of spent man-hours, etc. • Control over compliance with equipment operating conditions. • Participation in procedures aimed at checking equipment technical condition, quality of repair and update works, acceptance of new equipment being delivered to CPF. • Control over compliance with the rules of operation and maintenance equipment. • Participation in the planning of capital repairs and equipment upgrades. • Conclusion and supervision of contracts with manufacturers to supply spare parts and equipment, as well as with contractors-companies engaged in major repair of general (industrial and production and non-industrial) funds. • Providing of co-workers with necessary technical documentation. • Control over the record-keeping of reports on maintenance, including scheduled preventive and corrective repairs. • Conclusion and supervision of contracts with subcontractors. • Taking part in investigations of Electrical equipment failures.Drafting of the investigation reports. • Main equipment: ALSTOM gas turbine power station, diesel generators Caterpillar, Cummens, MCC (6 kV switchgears and control cabinets 0,4kV Technological electrical equipment), PDCS (power distribution system), HVAC (Ventilation, heating and air conditioning systems), soft start 6kV - "AllenBradley", transformers "step up" and "step down", frequency converters VSD and MVD, "Raychem" heating cables, "skin effect" (heating oil pipelines at long distances).
    • Июль 2012 – декабрь 2014
    • 2 года и 6 месяцев

    Duty Engineer of substation 330kV/110kV/10kV KOLPINO

    FEDERAL GRID COMPANY OF UNITED ENERGY SYSTEM

    Обязанности и достижения:

    • Service of substation 330кV Kolpino. Administrative-technical management of the object. Admission and supervision of the subcontractors’ work. • Work with operational staff of the substation (staff training, fire prevention and emergency response training); • Execution of routine switching as a control person; • Drawing up and checking of oncoming switching forms; • Control over timely round-checks, checkovers, maintenance and repair of the substation equipment; • Control over working place preparation, allowance of teams and acceptance of working places. Acceptance of the equipment after installation, maintenance and repairs.
    • Ноябрь 2011 – июнь 2012
    • 8 месяцев

    Chief Power Engineer

    SLAVNEFT-MEGIONNEFTEGAZ AGANSKOE NGDU

    Обязанности и достижения:

    • Provision of uninterrupted service, maintenance, repair and modernization of power equipment (overhead power lines 6, 35,110 kV; substations 35/6 kV, 6 kV (92 objects); KTPN 6 / 0.4 kV, motors 6kV (synchronous, asynchronous), 0,4kV (asynchronous), GTGs “Solar Turbines”, GPGs Waukesha, DGs Cummins, Caterpillar). • Planning the electricity consumption of oil production facilities and oil treatment (6 oil gas fields). • Development of measures to conserve energy. • Development of activities in capital construction, reconstruction and modernization of power equipment. • Monitoring over the construction works of energy supply objects: if they meet building codes, standards, specifications and other regulatory documents. • Organization and control over timely implementation of preventive maintenance. • Organization of record keeping concerning electrical equipment located at the object, as well as costing and analysis of energy and fuel consumption, technical and economic performance of power utilities, accidents and their causes. • Organization of uninterrupted energy supply. • Control over third parties concerning their fulfilment of obligations.
    • Сентябрь 2007 – ноябрь 2011
    • 4 года и 3 месяца

    Power Engineer

    NATIONAL DRILLING COMPANY "WEST SIBERIA"

    Обязанности и достижения:

    • Organization of installation, commissioning and operation of electrical equipment, drawing up of electrical and technical documentation, approval of electrical installations at Energonadzor, cooperation with energy supply companies, with retail energy sales companies, monitoring of relevant contracts, control over the operation of boilers by subcontractors. • Basic equipment: 5 mobile drilling rigs for drilling of sidetracks (MBU-125, CROWN, COOPER, ZJ-30). • Development, organization and monitoring over preventive work schedules. • Organization of record keeping concerning electrical equipment located at the object, as well as costing and analysis of energy and fuel consumption, technical and economic performance of power utilities, accidents and their causes. • Organization of uninterrupted energy supply.
    • Август 2004 – сентябрь 2007
    • 3 года и 2 месяца

    Senior Electromechanic

    NEFTESPECSTROY SLAVNEFT-MEGIONNEFTEGAZ

    Обязанности и достижения:

    • Management and control over construction and erection of electrical equipment and electrical installations on cluster sites oilfields (KTPN-160,250,400,630,1000 kVA, PLD-6 kV, 6 kV cable lines, SU ESP machines rocking); • Implementation of executive documentation concerning mounted objects, conducting of the working commissions for power engineers; • Preparation of annual requests for electric materials and equipment for the needs of capital construction and needs of the department; drawing up of reports on the movement of materials and equipment; • Conduction of operational work in electrical installations of "NSS" LLC; keeping of electrical documentation of the department; cooperation with energy supplying company "Megion-Energoneft" LLC for temporary connection of mobile residential wagons and welding positions.
    • Октябрь 2003 – август 2004
    • 11 месяцев

    Electromechanic

    TEPLONEFT SLAVNEFT-MEGIONNEFTEGAZ

    Обязанности и достижения:

    • Management and control over construction and erection of electrical equipment and electrical installations on cluster sites oilfields (KTPN-160,250,400,630,1000 kVA, PLD-6 kV, 6 kV cable lines, SU ESP machines rocking); • Implementation of executive documentation concerning mounted objects, conducting of the working commissions for power engineers; • Preparation of annual requests for electric materials and equipment for the needs of capital construction and needs of the department; drawing up of reports on the movement of materials and equipment; • Conduction of operational work in electrical installations of "NSS" LLC; keeping of electrical documentation of the department; cooperation with energy supplying company "Megion-Energoneft" LLC for temporary connection of mobile residential wagons and welding positions.
    • Август 1997 – октябрь 2003
    • 6 лет и 3 месяца

    • Electromechanic

    MEGIONSKOE UKRUPNENOE UPRAVLENIE BUROVIH RABOT MEGIONNEFTEGAZ / Megion Integtrated drilling department

    Обязанности и достижения:

    • Acceptance of drilling rigs Drilling Rig-3000, 3200EUK after installation and adjustment as a member of a labour commission; • conducting of operational work in electrical installations (six drilling crews with machines Drilling Rig-3000.3200); • emergency repair works, • works according to schedule outage works on transfer of 6 kV Overhead Line; • work with personnel (briefings, receiving examinations, training on methods and rules of safe operation at the workplace); participation in committees; • Drawing up of repair maps on electrical equipment of drilling rigs.

Образование

Обо мне

Дополнительные сведения:

Personal qualities: ability to manage team, focus on results, mobility, good communication skills, independence, high level of responsibility for the execution of tasks MS Outlook, MS Visio, MS Project, Driving Licence BC, SAP Salsa, PC user, Teamwork, English (intermediate level), Negotiation, AutoCAD

Иностранные языки

  • Английский язык — разговорный

Водительские права

  • B — легковые авто
  • C — грузовые авто
Фото, имя и контакты доступны только авторизованным пользователям
Похожие резюмеВсе 11 похожих резюме
Обновлено 3 ноябряПоследнее место работы (2 года и 6 мес.)Инженер по радиочастотным системамФевраль 2023 – август 2025
Обновлено 21 октября
Превью фото соискателя
Power engineer, electrical engineerз/п не указана
Последнее место работы (10 мес.)Senior Energy Efficiency ConsultantЯнварь 2025 – работает сейчас
Обновлено 2 августа 2013Последнее место работы (22 года и 4 мес.)Старший экспертАвгуст 2003 – работает сейчас
Обновлено 10 февраля 2021Последнее место работы (5 лет и 11 мес.)Electrical Superintendent, Руководитель по электро-монтажным работамМарт 2014 – февраль 2020
Обновлено 2 марта 2017
no-avatar
Electrical Engineerз/п не указана
Последнее место работы (8 лет и 9 мес.)Electrical Cost EngineerМарт 2017 – работает сейчас
Обновлено 4 декабря 2018
no-avatar
Electrical engineerз/п не указана
Последнее место работы (14 лет и 5 мес.)Commissioning electrical engineer and microprocessor relay protection and automationИюль 2011 – работает сейчас
Обновлено 8 ноября 2021
no-avatar
Electrical engineerз/п не указана
Последнее место работы (2 года и 3 мес.)Project engineerОктябрь 2012 – январь 2015
Обновлено 22 мая 2017
no-avatar
Electrical Technical Engineerз/п не указана
Последнее место работы (6 мес.)Electrical Engineer CadetИюнь 2016 – декабрь 2016
Обновлено 17 июня 2017
no-avatar
Electrical engineerз/п не указана
Последнее место работы (9 лет и 2 мес.)Инженер-проектировщикСентябрь 2016 – работает сейчас
Обновлено 5 августа 2021
no-avatar
Electrical Engineerз/п не указана
Работа в МосквеРезюмеСтроительство, проектирование, недвижимостьЭлектроснабжение

Смотрите также резюме