Обязанности и достижения:
• Plan, coordinate and manage the department budget to meets all requirements in terms of production volume, equipment technical condition, factory utilities utilization, operation costs, safety and people management.
• Organize business processes at assigned work area in compliance with Safety, Health, Ecology rules, policies and procedures. Evaluate risks at work places, take appropriate measures for risks reduction and safety culture improvement.
• Plan, organize and manage factory utilities effective utilization (water, gas, electricity).
• Determine the main maintenance policy and directions of the technical and energy development of the factory, the ways of reconstruction and technical re-equipment of the existing production, the level of specialization of production for the future
• Organize, control and evaluate the work of contractors and suppliers related to factory maintenance activities in order to optimize organizational structure and infrastructure of the group in the most cost-effective way while keeping high quality of the work fulfilled.
• Organize and control the processes of purchase, installation and acceptance of new equipment, ensuring effective interaction of internal and external resources and observance of the approved terms, quality level and expenses.
• Develop and maintain a high performance team with focus on people development.
- Specialists utilization factor (wrench time) improvement from 52%: +8% in 2018, +10.3% in 2019
- Equipment efficiency improvement from 78%: +2% in 2018, +3% in 2019
- Equipment production time improvement via maintenance stops minimization: +0.5% in 2018, +1% in 2019
- Safety culture improvement via people involvement in: risk assessment, safety meetings, behavioral audits, investigation reports, individual safety plans
- Rain water collection system efficiency improvement in 2018 (+2500 m2) and in 2019 (+4500 m2). As a result, 10% of water saving
- Service cost optimization: - 5% in 2018, -6.5% in 2019
- Electricity, compressed air, water consumption initiatives implementation for optimization
- Equipment automation / modernization / cleaning process improvement via projects implementation:
o High water pressure unit implementation
o Cooling walls implementation
o Lifting rollers unit development and installation for 2 lines
o Granulator units modernization on 2 lines
- CAPEX projects realization
- Technical expertise improvement approach development and implementation since 2019
- New organizational structure implementation in 2018
- New maintenance strategy implementation in 2018
- Lean Tools implementation in 2018 (SMED, VSM, PDCA)
- SAP system implementation in 2017
- Spare parts stock minimization: -3.5% in 2018, -11.3% in 2019