Обязанности и достижения:
Project:Design and construction of main sewerage collector in Bijelo Polje - Phase 1
Construction of 5.2 km gravity pipeline (DN 500, DN 600 and DN 800 HDPE corrugated, manufacturer Italiana corrugati)
Construction of 800 m pressure pipeline DN 400 HDPE, manufacturer Central Tubi, Italia
Construction of three Pumping stations with mechanical equipment
Construction of Optic cable line for Scada system (Civil works - excavation and installation concrete and hdpe corrugated chambers and HDPE protective pipes 2 x DN 40 for fibre optic cabl)
As built design
Assistant on the Secondary Sewerage Network design (2.5 km, pipes DN 400 and DN 250 HDPE corrugated)
Construction of 500 m secondary sewerage network pipeline
Weekly progress reports
Site diary, Construction book